Shower channel
Highline. The accent in the floor.
A 3 mm stainless steel panel with a wide frame. Striking, robust and timeless, made for large formats and natural stone.
3 mmMaterial thickness of cover and frame
70 · 80 · 90 cmthree lengths
60 mmBuild height from 60 mm
Build-up
Solid wherever you look.
Cover and frame are made from 3 mm stainless steel. The design is present but quiet, and stays a clear line in the floor even with large tiles and natural stone.
Frame and cover in stainless steel 1.4301, factory-fitted waterproofing membrane, abP-tested.
From shell to tile.
Keep scrolling: three steps, one picture.
Fit and connect.Channel body in the screed, DN 50 outlet.
Waterproof and tile.The wide frame holds the tile cleanly.
A clear accent.Stainless steel, 3 mm, a straight line.
Technical data.
| Material | Stainless steel 1.4301 / V2A (AISI 304), 3 mm |
|---|---|
| Lengths | 70 · 80 · 90 cm |
| Build height | from 60 mm |
| Drain | 360° rotating drain pot, DN 50 outlet, trap |
| Flow rate | 0.80 l/s (48 l/min) with the standard siphon, trap water height 25 mm |
| Waterproofing | Waterproofing membrane fitted at the factory, abP |
| Testing | abP, EN 1253 |
Ordering information.
4 variants.
| Item number | Size |
|---|---|
| LH8-H24L70E1 | 70 cm |
| LH8-H24L80E1 | 80 cm |
| LH8-H24L90E1 | 90 cm |
| Project-specific versionsNot held in stock. Manufactured for your project; lead time on request. | |
| LH8-H24L60E1 | 60 cm |
Identical for every variant: Surface Brushed stainless steel · Material Stainless steel 1.4301 / V2A (AISI 304) · Outlet DN 50
Special lengths on request. Every channel can be cut to size on site.
Installation in five steps.
The order follows the site: shell first, tile last.
ShellPosition the channel, connect it to the drainage and set the height.
Screed workLay the screed with a fall towards the channel; the protective cover sets the height.
WaterproofingRemove the protective cover and bond the waterproofing membrane into the bonded waterproofing.
Tiling workTile the floor with a fall towards the channel and grout the joints.
CoverInsert the cover and peel off the protective film last.