Skip to Content

Shower channel · New

Tileline. The channel you do not see.

Frameless and tileable. Fully integrated into the floor, and after installation only two narrow lines remain visible.

1.4301Channel body in stainless steel V2A
can be cut to sizedirectly on site, to any shower width
2 linesnothing more remains visible once tiled

Build-up

Everything that matters is already fitted.

The waterproofing membrane and the protective cover with membrane protection are fitted at the factory and included in the delivery. The protective cover serves as the height reference for the screed and is removed before waterproofing.

Optional: acoustic insulation element to decouple it from the building structure.

From shell to tile.

Keep scrolling: three steps, one picture.

Fit and connect.The channel body is levelled in the screed and connected to DN 50.
Waterproof and tile.The tile carrier takes the floor tile. No frame, no edge.
Two lines. Nothing more.What remains is a floor in one piece.

Technical data.

MaterialStainless steel 1.4301 / V2A (AISI 304), tileable tile carrier
Lengths80 cm · 100 cm · 120 cm, can be cut to size on site
WaterproofingWaterproofing membrane fitted at the factory, connects to the bonded waterproofing system
Scope of deliveryChannel body, tile carrier, waterproofing membrane, protective cover with membrane protection
AccessoriesAcoustic insulation element (optional)
TestingabP, EN 1253

Ordering information.

3 variants.

Item numberSize
LT16-H24L100E9100 cm
LT16-H24L120E9120 cm
LT16-H24L80E980 cm

Identical for every variant: Surface Brushed anthracite · Material Stainless steel 1.4301 / V2A (AISI 304) · Outlet DN 50

Special lengths on request. Every channel can be cut to size on site.

Installation in five steps.

The order follows the site: shell first, tile last.

ShellPosition the channel, connect it to the drainage and set the height.
Screed workLay the screed with a fall towards the channel; the protective cover sets the height.
WaterproofingRemove the protective cover and bond the waterproofing membrane into the bonded waterproofing.
Cutting to sizeCut the tile carrier to size and fit it.
Tiling workTile the tile carrier and the floor and grout the joints. Peel off the protective film last.